
A 120-foot tunnel was added to the park, in part paid for by a donation of $36,500 from the Town of Paradise Valley. The Partnership Tunnel was dedicated on Oct. 10, 1992. The 10-foot high, 10-foot wide and 125-foot long tunnel incorporated nine miles of rebar, 250 cubic yards of concrete and 8,000 concrete blocks.
DATE: